Most Renewal by Andersen projects follow the same pattern. You wait about six to eight weeks from the day you order to the day we install. Then we spend one to three days at your home. Smaller jobs often wrap up in a single day.
That second number matters most to you, because it tells you how long your house is actually disrupted. The wait before it comes from custom manufacturing. We build every window to fit your specific openings, so nothing sits on a shelf waiting for you.
Here’s the full timeline, what happens on installation day, and what can speed up or slow down your project.
Here is how a typical project unfolds from first conversation to final walkthrough. Exact timing varies by location and season, so treat these as planning ranges and ask your local team for firm dates.
| Stage | Typical timing | What happens |
|---|---|---|
| In-home consultation | About 1 to 2 hours | Your Design Consultant looks at your existing windows, talks through your goals, shows you options in your own home, and gives you a clear, complete price. |
| Final measurements | A separate short visit | A project technician examines the condition of your openings and takes the precise measurements used to build your custom windows. This is also when you can ask questions about installation day. |
| Custom manufacturing | Roughly 2 to 6 weeks | Your windows are built to your measurements and selections, then prepared for delivery. |
| Scheduling | Confirmed a few days ahead | We contact you by phone, text, or email to confirm your installation day and arrival time. |
| Installation | 1 to 3 days for most homes | Our Certified Master Installers remove the old windows, install the new ones, clean up, and walk the finished work with you. |
Once your windows arrive, the work moves quickly. Our Certified Master Installers work as a crew and keep each opening exposed for as little time as possible. In a typical insert replacement, the old window comes out and the new one goes in within minutes.
These are reasonable planning estimates for the work itself:
| Project | What to plan for |
|---|---|
| A standard window | About 60 to 90 minutes per opening, including preparation, fitting, sealing, and trim. |
| A typical crew’s output | Eight to 10 windows in a day is common. This Old House observed a Renewal by Andersen crew and reported the same pace. |
| A whole-house project | One to three days for most homes with 10 to 15 windows. Larger or more complex homes can take up to four days. |
| Patio doors | Most patio door replacements are completed in a single day. |
| Bay and bow windows | Plan for extra time. These units have multiple panels and more finishing work than a standard window. |
| A small project (a few windows) | Often finished in a few hours, and sometimes in less than a day. |
If you are curious what a crew’s day looks like from the inside, This Old House spent a day with a Renewal by Andersen crew and described the process step by step. You can also read our own replacement process overview for the full sequence.
Two homes with the same number of windows can take different amounts of time. These are the factors that matter most:
| Factor | How it affects your timeline |
|---|---|
| Number of windows | More openings means more hours. A larger crew can work in parallel, but very large projects may still span several days. |
| Window type and size | Large, specialty, bay, and bow units take more handling and finishing than a standard double hung. |
| Age and condition of your home | Older homes often have openings that have shifted over the years, which takes extra care to fit properly. |
| Hidden rot or water damage | Damage behind an old window is not always visible until the window is removed. If we find it, we will explain what we see and talk through next steps with you before moving forward. |
| Trim and finishing | More elaborate interior or exterior trim takes more time than a simple, clean opening. |
| Second-story access | Upper-floor windows require extra setup and safety work. |
| Weather | Crews work year-round, and much of the work happens from inside the home. Severe weather can still lead to rescheduling for safety. |
| Custom or unusual orders | Unique shapes and specialty options can lengthen the manufacturing stage. |
Some of the longest delays have nothing to do with the windows. They come from approvals you need before the work begins, so it pays to sort them out early.
The best approach is to ask these questions at your consultation so any approvals are underway while your windows are being built.
A little preparation helps your crew start quickly and finish on schedule. The day before, work through this checklist:
Staying put during installation is completely fine. Plenty of homeowners do it, mainly so they can answer the crew’s questions as they come up. If you want the details, our post on whether you need to leave home during a window replacement covers it.
Waiting weeks for windows feels like a lot, and it’s a fair question. Standard sizes ship fast, but they’re not built for your house. We build yours to the exact measurements taken at your openings. That’s why they fit right and perform well once they’re in.
According to ENERGY STAR, it is typical for high-performance windows to take six to 12 weeks to be delivered after ordering because they are made to order.
The advantage of that wait is the work that follows. A window sized to your opening installs faster and seals better than one that has to be adapted to fit.
Bring these to your consultation so there are no surprises about dates:
Every home is a little different, and the most accurate answer comes from seeing your windows in person. During your free, no-obligation consultation, your Design Consultant will look at your openings, talk through your options, and give you a clear, complete price along with a realistic schedule for your project.
Schedule your free consultation today and find out exactly how long your window installation will take!